Mettler-Toledo

With electricity rates and reliability risks in the Bay Area rising fast, this Fortune 800 high-tech manufacturer will leverage a microgrid to help power a facility expansion, reducing energy costs and emissions while providing zero-emission backup power.

solar panels in field

To meet rising demand, Mettler-Toledo Rainin is adding production capacity, but the energy intensity of its manufacturing process could add massive new demand charges to its electricity costs. Moreover, the perennial risk of both planned and unplanned power outages in the region led the company to seek ways to protect its high-value production with a more reliable, resilient power supply.

Scale is designing a microgrid to address these issues with on-site solar, battery storage, and smart controls. Thanks to the low-cost solar and optimized battery dispatch, the facility will achieve substantial bill savings and carbon reductions - a significant benefit for customers concerned about supply chain emissions. The microgrid will also enable the facility to continue operating during grid outages, with up to 24 hours of backup capacity. 

Big Picture Impact

35%

Electricity Cost Savings

72%

Lower CO2 Emissions

12-24

Hours of Zero-Emission Backup

The Mettler-Toledo Microgrid

The Mettler-Toledo Rainin microgrid will include 750 kW of rooftop solar, 530 kW/2121 kWh of battery storage, and a 4000 amp microgrid switchboard. Scale will own and operate the microgrid under a microgrid service agreement (MSA), with 24/7/365 remote monitoring and maintenance to ensure reliability. 

The MSA also eliminates up-front costs for Mettler-Toledo Rainin, replacing a large capital expense with a monthly service fee. This will enable the company to realize electricity bill savings from day one, with Scale operating the system to avoid excess demand charges by drawing on the battery during hours of peak load.

750 kW

Rooftop Solar

2121 kWh

Battery Storage

4000 Amp

Microgrid Switchboard

LEARN MORE
Learn More